Skip to content

Latest commit

 

History

History
101 lines (93 loc) · 3.38 KB

File metadata and controls

101 lines (93 loc) · 3.38 KB

Jump Service Implementation Progress

Documentation Standards

  • All public items (functions, structs, traits, etc.) MUST have doc comments
  • Documentation should follow Rust's documentation conventions:
    • Use /// for doc comments on items
    • Use //! for module-level documentation
    • Include examples in doc comments where appropriate
    • Document error conditions and panics
    • Use markdown formatting in doc comments
  • Each module should have a module-level doc comment explaining its purpose
  • Complex algorithms or business logic should have inline comments
  • Error types should document possible error conditions
  • Configuration options should be well-documented
  • Use #[deprecated] attribute with explanation when deprecating features

Tasks

Phase 1: Project Setup and Core Domain

  • Project initialization
    • Create new Rust project
    • Directory structure setup
    • Add dependencies in Cargo.toml
  • Dependencies setup
    • actix-web for API
    • redis for storage
    • tracing for logging
    • serde for serialization
  • Domain layer implementation
    • Documentation standards setup
    • Payload entity with docs
    • HashId value object with docs
    • MimeType handling with docs

Phase 2: Application Layer

  • DTOs implementation
    • CreatePayloadRequest/Response with docs
    • GetPayloadResponse with docs
    • Error responses with docs
  • Use cases
    • CreatePayload with docs
    • GetPayload with docs
    • DeletePayload with docs and proper error handling
  • Rate limiting
    • Redis-based rate limiter implementation
    • Rate limit middleware

Phase 3: Infrastructure Layer

  • Logging setup
    • tracing configuration
    • Request logging middleware
    • Error logging with detailed context
  • Redis repository implementation
    • Connection pool
    • CRUD operations
    • Expiry handling
    • Improved error handling and logging
  • HTTP API endpoints
    • API versioning structure (v1)
    • Payload size validation
    • Routes and handlers
    • Error handling middleware
    • Proper status codes (204, 404, etc.)

Phase 4: Testing and Documentation

  • Unit tests
    • Domain layer tests
    • Use case tests
    • Repository tests
  • Integration tests
    • API endpoint tests
    • Rate limiting tests
    • Delete endpoint tests
  • API documentation
    • OpenAPI/Swagger specs
    • Example requests/responses
  • README and setup instructions
    • Installation guide
    • Configuration options
    • Development setup

Phase 5: Deployment

  • Docker configuration
    • Multi-stage build
    • Optimized image size
  • Docker compose setup
    • Redis service
    • App service
    • Network configuration
  • Environment configuration
    • Environment variables
    • Railway.app specific setup
    • Logging configuration

Current Status

🚀 All core functionality is implemented and tested! Create, Get, and Delete payload endpoints are fully functional with proper error handling and rate limiting. Recent improvements include:

  • Fixed delete endpoint implementation with proper error handling
  • Added detailed logging throughout the application
  • Improved Redis repository error handling and validation
  • Fixed configuration issues in main.rs Next: API documentation and deployment configuration.