You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
deployment of process in one S-CORE module/platform repo, all documents are valid
- [x] Persistency Safety Analysis done
- [x] Persistency Safety Analysis FDR
- Safety Analysis ongoing for Baselibs and Platform
Epic Description
Get the Documentation Management from ML2 to ML3
First the gaps in the process according to the definition in https://eclipse-score.github.io/process_description/main/ have to be documented in below list
deployment of process in one S-CORE module/platform repo, all documents are valid
- [x] Persistency Safety Analysis done
- [x] Persistency Safety Analysis FDR
- Safety Analysis ongoing for Baselibs and Platform
process requirements prio 1&2 "automation" are implemented in tooling
- [x] gd_req__saf_attr_ver add versioning of requirements #708
- [x] gd_req__saf_finalization_check --> Deleted. Is covered by the review(s), part of the checklist(s) and also results are shown in the verification reports.
Update process requirements #716
respective tool evaluation done
n/a
Safety Audit passed (no open deviations/actions)
Part also of last audit. All findings closed
Acceptance Criteria (DoD)
all identified gaps have been resolved