Skip to content

Latest commit

 

History

History
60 lines (52 loc) · 2.76 KB

File metadata and controls

60 lines (52 loc) · 2.76 KB

Work Log — ProjectAmazonPH

2026-08-21

Session: Full Documentation Refresh (docs/refresh-2026-08-21)

  • Reconciled 6yr → 8yr PPC specialist inconsistency (PRD/README are source of truth)
  • README.md — refreshed task list, current build section, last-updated stamp
  • AGENTS.md — refreshed directory map, added related-repos list, removed Hermes-specific paths
  • PRD.md — bumped to v2.1, date stamp
  • DEV-PLAN.md — fixed Phase 5 (was PLANNED, actually Live per PRD), Phase 6 status update, resolved open Q1
  • MASTER-PLAN.md — fixed 6yr → 8yr, advanced status from Phase 0 → Phase 3 (current week)
  • brand-kit/BRAND-KIT.md — fixed "Online Prescence" typo, refreshed "Adcraft Academy" → AMPH Academy
  • content-calendar/CONTENT-CALENDAR.md — moved to August 2026 cycle
  • marketing/MARKETING-STRATEGY.md — date stamp + content-mix refresh
  • seo/SEO-PLAN.md — date stamp, fixed "specialary" typo in URL
  • tool-audit/TOOL-AUDIT.md — removed hardcoded local paths, refreshed naming
  • docs/architecture.md — refreshed naming, date stamp
  • docs/decisions.md — refreshed ADR-005 reference
  • amazon_ph_flow/README.md — replaced {{crew_name}} placeholders with amazon-ph-flow
  • interview-lab-ui-fix-plan.md — added redirect note (this plan belongs in Interview-lab repo)
  • TODO.md / KANBAN.md — added note that tracking moved to GitHub Issues

Reconciled facts (source of truth = PRD v2.1 + README):

  • 14-year VA industry veteran
  • 8-year Amazon PPC specialist
  • ₱50M+ managed ad spend
  • AMPH Academy v2 = live (8 modules, 31 lessons)
  • amph-v2-greenfield = in production hardening
  • Today: 2026-08-21, currently in Phase 3 of Master Plan

2026-07-02

Session: Documentation Standardization

  • Created PRD.md — full product requirements
  • Created DEV-PLAN.md — 6-phase development plan
  • Created WORKLOG.md — session tracking
  • Created docs/architecture.md — brand + content architecture
  • Created docs/decisions.md — ADRs

2026-06-25 to 2026-06-30

Session: Brand & Marketing Foundation

  • Completed BRAND-KIT.md with full brand guidelines
  • Completed MASTER-PLAN.md — full campaign plan
  • Completed MARKETING-STRATEGY.md — funnel + channels
  • Completed SEO-PLAN.md — keyword and technical SEO
  • Completed CONTENT-CALENDAR.md — Month 1 schedule
  • Completed TOOL-AUDIT.md — assets and gaps
  • Completed facebook-content-engine.md — automated posting system
  • CrewAI research: 8-output amazon_ph_flow report

Decisions:

  • Facebook-first distribution strategy (Page 9AM, Group 6PM)
  • Taglish bilingual voice for content
  • Orange + Navy brand colors

Next:

  • Begin Facebook Group growth phase
  • YouTube content production