Stagger daily package update schedule - #17
Merged
Conversation
All Cratis repositories ran Update Packages at exactly 06:00 UTC, launching 36 simultaneous jobs (plus their push-triggered CI cascades) into the organization's shared 20-slot hosted-runner pool, contributing to the 2026-08-25 runner starvation. Each repository now has a deterministic schedule spread across 03:00-06:59 UTC, off the congested top of the hour.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Part of the org-wide Actions throttling remediation: all 36 repos ran Update Packages at exactly 06:00 UTC, stampeding the shared 20-slot hosted-runner pool (a factor in the 2026-08-25 runner starvation). This repo's slot is now
25 5 * * *(UTC), assigned deterministically so no two repos share a minute and none sit on the congested top of the hour. One-line change; YAML validated.