Skip to content

Pull requests: openshift/cluster-baremetal-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

OCPBUGS-54957: Remove recreate strategy from BMO deployment approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/severity-moderate Referenced Jira bug's severity is moderate for the branch this PR is targeting. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#640 opened Aug 5, 2026 by honza Member Loading…
CNF-22903: Add support for Ironic Networking service jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#630 opened Jul 17, 2026 by alegacy Contributor Loading…
WIP Fix baremetal co progressing during upgrade do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#628 opened Jul 8, 2026 by MahnoorAsghar Contributor Loading…
METAL-1833: Add bmo_validations ncsi_reject_poweroff OTE test jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#618 opened Jun 22, 2026 by sgoveas Contributor Loading…
METAL-1833: Add attach_non_bootable_iso OTE test jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#617 opened Jun 19, 2026 by sgoveas Contributor Loading…
NO-ISSUE: fix typo: 'occured' -> 'occurred' in error message jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. verified Signifies that the PR passed pre-merge verification criteria
#600 opened May 11, 2026 by SAY-5 Loading…
WIP: Use IrSO to deploy Ironic do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#523 opened Nov 6, 2025 by alegacy Contributor Loading…
NO-ISSUE: Update the comment on pull secret generation acknowledge-critical-fixes-only Indicates if the issuer of the label is OK with the policy. approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. verified Signifies that the PR passed pre-merge verification criteria
#503 opened Aug 27, 2025 by dtantsur Member Loading…
ProTip! Find all pull requests that aren't related to any open issues with -linked:issue.