docs: Phase P plan — sc-lint 0.5.0 dual-consumer upgrade qualification - #508

Open
randlee wants to merge 2 commits into
developfrom
feature/sc-lint-upgrade-planning
Open

docs: Phase P plan — sc-lint 0.5.0 dual-consumer upgrade qualification#508
randlee wants to merge 2 commits into
developfrom
feature/sc-lint-upgrade-planning

Conversation

@randlee

@randlee randlee commented Aug 17, 2026

Copy link
Copy Markdown
Owner

Summary

  • Adds the authoritative Phase P plan: qualifying a released sc-lint 0.5.0 consumer contract against both sc-compose and atm-core before either repo converts.
  • Adds sprint records P.1 (dual-reference qualification), P.2 (sc-compose conversion), P.3 (atm-core acceptance) — all currently status: planned, no implementation started.
  • Documents the ADR-0016/ADR-0017 amendment requirement and the reserved-recipe migration gate blocking P.2/P.3 until P.1 passes.

Status

Planning-only PR for review. No implementation sprints have started; the plan is blocked on an upstream released sc-lint 0.5.0 artifact.

Test plan

  • Review plan structure, requirement/ADR traceability table, and sequencing for correctness
  • Confirm boundary-rule compliance section matches CLAUDE.md rules
  • Confirm sprint docs (P.1–P.3) are consumable as-is by implementers

🤖 Generated with Claude Code

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant