SECURITY.md

NCP security

Candidate status: these are the requirements for unreleased 1.0.0-rc.1. Local configuration and validator tests exist, but the stable Zenoh adapter cannot yet expose a transport-authenticated remote principal for payload-identity binding. Its production-secure open path fails closed. Live mTLS, ACL, certificate rotation/revocation, packet/process capture, and independent-host certification are therefore NOT RUN, and the candidate is release-blocked.

Report vulnerabilities privately through the repository's GitHub security advisory flow. Do not include credentials, private keys, sensitive plant data, or exploit details in a public issue.

Threat boundary

NCP assumes a network attacker may read, inject, replay, reorder, delay, duplicate, or drop traffic; a credentialed peer may claim the wrong entity/role/plane; a prior authority holder may reconnect or replay; and malformed JSON may attempt resource exhaustion. Local simulation or plant processes may crash or restart.

NCP does not defend a fully compromised body host, certify physical safety, define a universal safe action, or turn mode/ttl_ms into authentication. The body remains final actuator authority and needs independent safety controls.

Baseline profiles

The only registered profiles are defined in contract/security-profiles.v1.json.

dev-loopback-insecure

This profile permits only loopback TCP or an absolute Unix-domain socket. It has no transport authentication and must expose an unmistakable insecure status. A non-loopback bind, downgrade flag, TLS fragments, hidden discovery/listeners, or a claim that this profile is production-safe fails startup.

production-secure

This profile requires all of the following, with no fail-soft fallback:

  • mutual TLS on every remote connection;
  • validation of certificate chain, peer identity, hostname/service identity, and validity interval;
  • protected private-key material outside repository/image content;
  • one default-deny authority manifest for realm, certificate principal, NCP entity, principal role, and allowed planes;
  • explicit action publishers; wildcard action grants are forbidden;
  • certificate revocation and rotation procedures;
  • profile ID and exact SHA-256 security-state digest in negotiation and audit;
  • no plaintext, discovery, listener, or insecure-profile downgrade on failure.

Partial configuration is invalid. A router or peer must not start a production NCP surface until the complete precommitted profile validates.

The digest algorithm is portable and closed, not sha256(json.dumps(...)) or a language-specific struct serialization. The normative security-state-digest projection uses the shared typed canonical encoding, sorts principals and planes semantically, inserts the documented false authority-flag defaults, and covers the exact bind, authority, TLS-path, downgrade, and status state. Unknown members, duplicate identities/planes, malformed Unicode, noncanonical endpoints, and projection-limit violations reject before hashing. Certificate and key file bytes are deliberately outside the digest; installed certificate validity and key protection remain runtime checks.

The current ncp-zenoh callback surface supplies the key and payload but not the verified remote certificate principal. It therefore cannot compare that principal with IdentityClaim through the authority manifest. ZenohBus::open_secure performs a TLS-client configuration preflight and then fails closed before opening. That preflight does not validate the authority manifest, deployed router ACL, negotiated security-state digest, callback-visible peer principal, rotation, or revocation. All of those checks and their negative tests are prerequisites to lifting the fail-closed gate. The templates do not make generic open, with_config, or from_session calls production-secure.

Identity and authorization

IdentityClaim is payload metadata, not proof. The transport adapter obtains the verified certificate identity and calls the authority manifest to authenticate the claimed principal/entity on the actual plane. A match on principal alone is insufficient. Unknown roles/planes and identity segments containing wildcards, separators, whitespace, control characters, or excessive length fail closed.

That binding is a missing implementation prerequisite, not merely missing test evidence. A TLS connection or router key ACL without callback-visible verified peer identity cannot satisfy it.

Every NCP-aware data-plane boundary binds both routing identity and incarnation: the payload session_id must exactly equal the session encoded in the actual Zenoh key, and session.generation must equal the current server-issued generation retained from SessionOpened, before publication, callback delivery, or latch mutation. The rule covers perception, action, observation, named channels, and ESTOP. Every remote ESTOP needs a complete kind/version/own-stream/session envelope; only its authority lease may be absent after authenticated actor/plane and exact live-session admission. Inbound messages are never repaired or assigned a generation. This isolation check does not establish that an ESTOP reached the intended plant, that the plant executed a safe action, or that physical motion stopped; those require independent body-local safety and delivery evidence.

Action authority additionally requires a live session generation and matching bounded lease. Lifecycle mutations require the same lease plus idempotency context; receipts bind results to the authenticated responder. Operator reset/override rights are separate manifest bits and may only belong to an enrolled operator.

Lease renewal authenticates two actors, not just lease bytes: the supplied issuer and current holder must match the active immutable lease, the issuer must be an enrolled commander or an operator with explicit override authority, and the holder must remain the enrolled commander. The receiver's current monotonic deadline must be strictly unexpired. A late renewal fails closed to HOLD and cannot revive the term; a newer acquisition is required.

There is no stable wire-1.0 reset RPC. An authorized body-local or out-of-band ESTOP reset is successful only as a session-generation cut: retire the current generation, authority and lease, and all associated stream state, then remain non-actuating until a fresh SessionOpened creates a new generation, fresh streams are established, and a new matching authority lease is acquired. A local governor, authority-machine, or buffer reset helper alone neither authenticates a reset nor restores remote authority. A frame from the retired pre-reset generation, including ESTOP, is rejected by exact route/session binding before latch or control processing. The old authority machine and action buffer are retired audit state and reject every later open, acquire, renew, reconnect, or command operation; implementations create fresh objects only after a new generation is issued.

Revocation blocks new authentication immediately, transitions affected active authority to fail-safe behavior, and does not clear ESTOP. Reconnect must prove the same session generation, term, lease, principal, and entity within the local monotonic deadline.

Configuration artifacts

deploy/profiles/ contains profile templates and deploy/zenoh-access-control.json5 contains the reference per-plane Zenoh ACL structure. Templates are not credentials and are not deployment evidence. Its action PUT rule is deliberately concrete for one NCP_SESSION_ID sentinel because Zenoh can publish wildcard key expressions. Render that sentinel to an exact quarantined session; enumerate every additional session and named action channel as a concrete rule rather than adding a wildcard action grant. Provision real certificates securely, and validate with:

python3 scripts/validate_security_profile.py --self-test
python3 scripts/check_acl_template.py
python3 scripts/verify_acl_deployment.py --self-test

Those commands prove deterministic configuration rules only. Release certification cannot begin until an adapter provides the required authenticated-principal binding. It must then start installed peers and a real router, exercise correct and incorrect CA, expired/not-yet-valid certificates, wrong entity/plane, unauthorized action, downgrade, rotation, and revocation, and retain packet/process/ACL evidence. The matrix must also inject missing/cross-session IDs and missing/stale generations on every data plane (including named channels and complete ESTOP envelopes), prove rejection before delivery or latch mutation, and prove a complete same-live-session ESTOP reaches the intended plant-safe-action path. This external production-secure campaign is NOT RUN; none of that live evidence exists yet.

Resource and audit controls

Apply contract/limits.v1.json before generic JSON allocation. Bound transport tasks and queues by plane; never hide an observation flood or retry storm behind unbounded work.

One Zenoh command publisher uses one epoch and position allocator for Active, HOLD, and ESTOP. An attempted put consumes the position even when delivery is ambiguous. After an ambiguous fail-safe attempt, the bounded dispatcher rejects Active until a new logical fail-safe with a new position succeeds; it never spins on or reissues the ambiguous position.

Exercise duplicate, replayed, reordered, and delayed frames both within one live session and across retired session/stream epochs. A duplicate or stale frame must not refresh a lease, watchdog, TTL, authority, stream high-water mark, or active output. ESTOP retains its documented same-session fail-safe priority, but it does not bypass routing identity. These local rules have deterministic tests; the multi-process fault/replay campaign remains NOT RUN.

Audit events follow contract/observability.v1.json. Do not log secrets or raw channel payloads by default, and do not put session, principal, entity, or operation IDs into metric labels. The local SHA-256 audit chain detects mutation but is not a signature; production evidence requires an independent external anchor.

Release decision

Passing local tests does not make production-secure available or certified. The implementation prerequisite and external pre-release gate are tracked in RELEASE_READINESS.md, under the canonical policy in contract/release-gates.v1.json. Until both pass against one immutable installed-artifact set, do not expose this candidate as a production control surface.

The current fail-closed unit test checks the exact missing-principal-binding error before the transport opener is reached in source order. It is a reason-code and control-flow regression, not packet/process proof of zero network side effects; the latter belongs to the external certification matrix and remains NOT RUN.

There aren't any published security advisories